Manually change Ion Chef™ Instrument run status
An Ion Chef™ Instrument run must have a status of Planned before a sequencer can start a sequencing run. If the connection between an Ion Chef™ Instrument and Torrent Suite™ Software is temporarily lost or interrupted, the status of the Ion Chef™ run may be marked as Reserved, even if the run has completed. To resolve this problem, you can manually change the status to Planned and enable the run for sequencing.

(Actions)